One task. One tool. Built to your method.

Custom engineering and operations software for the workflow no vendor sells. The tool does one job — the job your people repeat every week — and does it faster than any general product can, because it encodes your method, your rates, your formats.

Discuss a Workflow → See a real one

The buildFrom RM 9,000 · fixed
Timeline3–5 weeks, typical
Blueprint firstRM 2,250 · credited to the build
OwnershipSource code delivered — yours
1workflow per build — never buried scope
2revision rounds included
30days post-live support
0licence fees, ever

The problems this solves

Built for the job your team repeats.

Quotations take hours

Your engineer rebuilds the same costing spreadsheet every week — and every revision starts it again.

One spreadsheet, one person

The formulas are trusted only by their author. Everyone else is afraid to touch the file that runs the business.

Documents rebuilt by hand

The same quotation, BOM and report re-assembled and re-formatted in Word, job after job.

No revision history

REV B to REV C is explained from memory. Nobody can show what changed, or why the price moved.

Before / with Valtrin

The same quotation, held differently.

Today
Open the last similar quote
Copy and edit in Excel
Recalculate from memory
Reformat in Word
Export and rename the PDF
Email the customer

6 manual steps · every quotation, every revision

With Valtrin
Enter the project data
Engine calculates cost, weight, BOM
Document generated in your format
Revision stored with a signed delta

1 manual step · the rest is the system's job

What we typically build

Tools shaped like your work.

01Estimating enginesGenerate the quotation instead of rebuilding it — cost build-up from your rates, your margins.
02BOM & material take-offWeights and quantities computed from the scope, not retyped from a printout.
03Drawing & document registersRegisters that keep themselves current — revisions, transmittals, status.
04Job & enquiry trackersEvery job, its status and its owner in one place, instead of in someone's head.
05Engineering calculatorsYour standard calculations, encoded once, checked and repeatable forever.
06Document generationQuotations, reports and datasheets produced in your template, with your numbering.

Extend the tool — priced up front

Add-onBasisPrice
Additional cost/logic moduleA further calculation domain within the same tool — e.g. adding NDT costing to an estimating engine.Per moduleRM 3,500–8,000
Excel/CSV bulk importStructured importer for a legacy data source, including cleaning rules.Per sourceRM 2,500–6,000
Branded document enginePixel-accurate PDF output in your quotation or report format, multi-template.Per format setRM 3,000–7,000
Revision & audit historyWho changed what, when — and the delta between issued revisions.Per toolRM 4,000–9,000
Multi-user with rolesLogin, admin / editor / viewer permissions, concurrent editing rules.Per toolRM 3,000–14,000
ERP/accounting read integrationPull live data from an existing system, read-only.Per systemRM 5,000–15,000
Dashboard & analytics layerManagement view over the tool's accumulated data — trends, win rates, margins.Per toolRM 2,250–10,000

Every build is scoped before a fixed quote is issued.

An engineering workstation running purpose-built software
From RM 9,000fixed price
3–5 weekstypical build
30 dayspost-live support
Built around your files

Excel in. PDF out. Your templates, your numbering.

A purpose-built tool doesn't ask your team to change how they work. It reads the files you already have, loads your rate tables, material libraries and standard items, and produces documents in the format your customers already recognise.

Then it's validated the only way that matters: against results you already trust, on cases you choose, to a tolerance agreed in writing before the build starts.

Discuss a Workflow →

Selected work · real and demonstrable

A fabrication estimating engine, deterministic to the kilogram.

The Valtrin estimating engine — click the numbered points to explore
The job, identified

Number, client, enquiry date — the register starts here, not in a filename.

Scope as line items

Plate, pipe, sections, flanges — weights and material cost computed from published data as you type.

The cost builds itself

Material, labour, treatment, NDT, overhead, margin — assembled the way a shop actually costs a job.

Revisions with receipts

REV B to REV C shows every delta, signed. The spreadsheet can't tell you why — this can.

Click the numbered points

Quotation, weight, BOM and labour build-up computed from published engineering data. Every rate is editable, because in a real build the rates are yours. Nothing is a lookup of a finished price — the cost builds up the way a shop builds it, which is why it can be validated against quotes already issued.

100%deterministic — same input, same answer
REV B→Csigned deltas on every change
0invented numbers — validated on known results

View the case study →

Typical engagement

From blueprint to working tool.

01 · Free

Workflow Review

An honest first look at the process — and whether it's worth building for at all.

02 · Wk 1–2

Workflow Blueprint

The process mapped, costed and specified. RM 2,250, credited toward the build.

03 · Wk 3–5

The build

Fixed price, per the specification. Your real data loaded, two revision rounds.

04 · Go live

Validate & hand over

Reproduces results you already trust. Training, documentation, 30 days support.

FAQ

Asked before every build.

Who owns the software?

You do — outright. Source code delivered, no licence fees, no subscription, no lock-in. Take it to another developer tomorrow if you want to. Valtrin retains only the right to reuse generic, non-confidential logic.

What does it really cost?

From RM 9,000, fixed — most engagements land between RM 9,000 and RM 45,000 depending on calculation depth and integrations. Nothing is built at a fixed price until the Workflow Blueprint (RM 2,250, credited in full) has defined it. Every build is scoped before a fixed quote is issued.

How do we know the numbers are right?

Validation is written into the engagement: the system must reproduce results you already have, on cases you choose, to a tolerance agreed in writing before the build starts — or the final balance is not payable.

Should we just stay in Excel?

Maybe — Excel is not the problem. The problem begins when multiple versions circulate, one person understands the formulas, data is entered repeatedly and there is no audit history. We replace the workflow when the workflow has outgrown it. If Excel still fits, we'll say so in the free review.

Start here

Show us the tool you wish existed.

Describe the job your team repeats — the spreadsheet, the rebuild, the retyping. You don't need to specify the software; describe the work.

calvin@valtrintechnologies.com
+60 11-1122 6683 · Kuala Lumpur, Malaysia

Discuss a Workflow →

The first conversation is free, and it includes an honest answer about whether a build is worth it.